Groundwater Remediation
Experts in 'immediate response' groundwater remediation measures.
Assessment and Approvals
Our experienced approvals experts and engagement specialists deliver large mining, property and infr...
Auditing and Compliance
Accredited in-house auditors covering all applicable state and territory auditor schemes.
Hygiene and Hazardous Materials
If you do a job, do it properly.
Due Diligence and Liability
Rapid response with pragmatic, commercial, expert advice tailored to address the level of risk and y...
Fire Management Planning
Our highly accredited and experienced Fire Management Planning team are leaders in the development a...
Ecology
Our experienced team specialise in conducting baseline ecological surveys that meet and exceed the r...
Consentium
The corporate affairs and ESG division of JBS&G
Digital and Creative Solutions
Effectively communicate your project story to build stakeholder involvement, lower risk and strength...
Contaminated Land
JBS&G is an industry leader in dealing with all facets of Contaminated Land.
Landfill Services
Offering services covering all aspects of Hazardous Ground Gas management, assisting our clients in...
Projects

Margaret River Surf Pro Bushfire Management Plan

Bushfire risk planning and management doesn’t only apply to permanent habitable buildings.

Sometimes councils require a development application to be submitted for temporary buildings and tourist events (e.g. sports events, music festivals etc), which if located in a designated bushfire prone area, require assessment of the bushfire risk to life and property assets and demonstration of compliance to relevant guidelines or legislation.

One such event is the Margaret River Surf Pro, a world-class tourism event held at several locations in the Margaret River area which showcases the South West of Western Australia to a global audience. Engaged by Surfing WA, we prepared a Bushfire Management Plan (BMP) to support the development application for this tourism event.

The challenge with events of this nature is that there is no specific regulatory guidance in the West Australian State Planning Policy 3.7 for temporary structures or events. In the absence of regulatory guidance, the BMP was developed using best-practice principles and methodologies from SPP 3.7, the Guidelines, and Australian Standard 3959-2009 Construction of buildings in Bushfire Prone Areas. As portions of the event sites were assessed as being in areas with BAL-40 or BAL-FZ ratings, the BMP successfully demonstrated compliance with ‘unavoidable development’.

Various ‘Performance Principle Solutions’ were used to address non-compliances with the prescriptive Acceptable Solutions of the Guidelines, and to demonstrate compliance with the bushfire protection criteria of the Guidelines. Evacuation diagrams for each of the event sites were produced to nominate emergency assembly areas for bushfire scenarios.

Margaret River, WA

Get in touch with us today to discuss your project

Contact us